A district-scale hard rock lithium project built around the past-producing Norrabees pegmatite mine
1,675 km²
District-scale land package
50+km
Pegmatite field
40
Known spodumene-bearing pegmatites
30,000 t
Existing stockpile for monetization
The Springbok Project is a district-scale hard rock lithium project in the Northern Cape of South Africa — roughly 80 km north of the town of Springbok and directly south of the Orange River, near the Namibian border. It is anchored by the past-producing Norrabees lithium pegmatite mine, an associated stockpile, and a 1,675 km² land package that opens up significant regional exploration potential.
Springbok is the anchor of Lithium Africa’s capital-light model. It pairs near-term, non-dilutive funding optionality — a permitted starter resource and an existing 30,000-tonne stockpile now in a sale process — with district-scale discovery upside across a 50+ km pegmatite field. An ongoing 3,500 m DD and RC program aims to define a new mineral resource at Norrabees and highlight other key pegmatites for regional scalability.
Northern Cape, South Africa — about 80 km north of Springbok town and south of the Orange River near the Namibian border. The single, continuous land package has established road access, water, and power, and connects to South Africa’s west-coast logistics corridor and the Saldanha Bay deep-water port.

Springbok Project (1,675 km²), Northern Cape — road-connected to the west-coast corridor and Saldanha Bay deep-water port. - Past-producing Norrabees spodumene mine on a mining permit.
- 1,675 km² district-scale land package with more than 40 known spodumene-bearing pegmatites over a distance of 50 km — with more exploration upside.
- Existing 30,000-tonne stockpile at 1.61 wt% Li₂O is in a sale process; firm offer targeted Q3 2026 — a path to non-dilutive funding.
- Historical 2024 inferred estimate of 71,679 t at 1.27% Li₂O across stockpile and in-situ material.1
- 3,500 m ongoing DD and RC program at Norrabees; initial MRE targeted Q4 2026.
- Regional mapping and structural work underway to generate new drill targets.
Springbok sits within the Orange River / Namaqualand pegmatite belt — a swarm of lithium-cesium-tantalum (LCT) pegmatites extending more than 50 km across the project. Forty spodumene-bearing pegmatites are already known (~30 of which were discovered recently by Lithium Africa), yet only two have ever been drill-tested, leaving the great majority of the district untested. Spodumene is hosted in coarse-grained pegmatites with mapped widths typically in the ~5–15 m range; the past-producing Norrabees pegmatite and its stockpile confirm economic-grade spodumene on the property.
In scale and single-owner consolidation, Lithium Africa likens the district to Brazil’s “Lithium Valley,” where more than 250 Mt of resources and over US$2 billion of market value are spread across five separate companies — at Springbok, the equivalent district is held under one license.

District-scale comparison: Brazil’s “Lithium Valley” (multiple owners) vs. the Springbok district held under one license.
1 Historical 2024 inferred estimate per a NI 43-101 technical report for Moonbound Mining Ltd. (now Cape Lithium Corp.) by Dr. Johan Hattingh of Creo Design (Pty) Ltd., dated 17 January 2024. The estimate is historical and inferred; a qualified person has not done sufficient work to classify it as current. Stockpile tonnage is indicative from the previous operator and subject to an assay program in progress.Significant Intercepts – Norrabees 1
Hole ID From (m) To (m) Interval (m) Li2O (%) Max Li2O (%) NB1DD26-003 18.5 26.0 7.5 1.97 2.75 including 20.0 26.0 6.0 2.27 2.75 NB1DD26-001 2.0 6.0 4.0 2.25 3.09 NB1DD26-004 21.0 29.0 8.0 1.70 4.11 including 21.0 25.0 4.0 2.59 4.11 NB1DD26-002 1.0 1.78 0.78 0.95 0.95 Notes: Intervals are reported as downhole lengths; true widths are not yet estimated. Intercepts are length-weighted averages reported at a 0.4% Li₂O cut-off with a maximum of 2 m of consecutive internal dilution; “including” intervals are reported at a 1.0% Li₂O cut-off with no internal dilution. No top cut has been applied. Max Li₂O is the highest single-sample assay within each interval; each is a 1.0 m sample except NB1DD26-002, whose interval is a single 0.78 m sample. Where field duplicates were collected, only the original sample is used. Li₂O = lithium oxide, calculated as Li (ppm) × 2.153.
* Interval open at depth. Samples from 22.0 m to 44.0 m in NB1DD26-004 were analyzed in a laboratory batch in which a certified reference material returned a value outside the Company’s acceptance limits; that batch is being re-analyzed and those results will be reported once received and validated. The sample reported here (21.0–22.0 m) with an assayed value of 4.11% Li2O was analyzed in a separate batch in which all control samples passed. Assays for NB1DD26-005 and NB1DD26-006 are pending.
Drill Hole Collar Details – Norrabees 1
Hole ID Easting (m) Northing (m) Elev.
(m)Az.
(°)Dip
(°)Depth
(m)Status NB1DD26-001 790486 6794007 634.0 010 −42.0 40.16 Reported NB1DD26-002 790485 6794006 634.0 010 −60.0 31.75 Reported NB1DD26-003 790460 6794010 648.3 015 −40.5 52.61 Reported NB1DD26-004 790459.5 6794009.5 648.3 015 −50.0 46.33 Reported NB1DD26-0051 790459 6794009 648.3 015 −70.0 121.90 Assays Pending NB1DD26-0061 790484 6794012 634.0 289 −40.0 19.65 Assays Pending NB1DD26-0071 790436 6794039 662.0 114 -41.1 67.27 Assays Pending NB1DD26-0081 790436 6794039 662.0 114 −60.0 43.60 Assays Pending Notes: Coordinates are in WGS 84 / UTM Zone 33S and were located by handheld GPS. Azimuth and dip are collar orientations. Depth is the end-of-hole depth. All holes are HQ/NQ diamond core drilled by Van Zyl Drilling.
1 Only one result reported in this press release; other samples from this hole (22m to 44 m) were analyzed in a batch of samples for which one reference standard was outside acceptable limits so they have been submitted for re-analysis and its results are not included in this news release.
2 Assays from the other two DD holes drilled at Norrabees I have not yet returned from the lab and will be disclosed in a subsequent news release when available.





